Certified Gillette Installer

Gillette Generator Installation Houston, TX

Commercial and industrial standby power for Greater Houston facilities. Three-phase systems, load analysis, permitting and commissioning handled by one licensed contractor.

Call (832) 291-4433 Request a Commercial Quote
TECL #38858Licensed & InsuredAvailable 24/7Financing Available

Downtime Is the Real Cost of an Outage

When a Houston facility loses power, the cost is not measured in comfort. It is measured in spoiled inventory, idle crews, failed inspections and missed orders. RBG Services LLC installs Gillette standby generators for commercial and industrial sites across Greater Houston. We handle the load analysis, the permitting, the pad, the transfer switch and the commissioning test. You get one licensed contractor start to finish.

We are a licensed Texas electrical contractor, TECL #38858, working out of 14203 Aston St in northwest Houston. We answer the phone. We show up when we said we would. We tell you what the job actually costs before we start.

Why Houston Facility Managers Choose Gillette

Gillette Generators has built power systems in Elkhart, Indiana since the early 1960s. That is more than 50 years of continuous manufacturing in the United States. The company builds industrial units from roughly 25 kW up to 2 MW. That range covers a small retail strip through a full distribution center.

Built for Three-Phase Loads

Most residential standby brands top out well below what a warehouse, a chiller plant or a server room actually pulls. Gillette's industrial line is designed around three-phase service from the start.

UL 2200 Listed

UL 2200 is the safety standard for stationary engine generator assemblies. A listed unit clears plan review faster and gives your insurer and your AHJ a straight answer.

Engines You Already Know

Gillette pairs its alternators with Perkins, John Deere, Volvo and Mitsubishi diesel engines. Parts and service are available locally, so you are not waiting on one proprietary supplier.

What We Install

Gillette's catalog splits into three families, and we size across all of them. If you are unsure which fits, that is what the load analysis is for. We do not guess and we do not oversize you into a bigger invoice.

Commercial Gas Standby

Natural gas or LP units for sites with reliable utility gas. No fuel storage, no fuel polishing, no tank inspections. The common choice for offices, clinics, restaurants and retail.

Industrial Diesel Standby

Higher kW output and better response under heavy motor starting. The right call for facilities that need to ride out a multi-day outage independent of the gas grid.

Prime Power

Units rated to run as the primary source rather than a backup, including Tier 4 Final and Stage 5 compliant diesel. Built for job sites, remote yards and temporary facilities.

Load Analysis & Sizing

We measure actual demand instead of adding up nameplate ratings. Motor starting current on large HVAC and pumps drives sizing more than anything else.

Transfer Switch Installation

The automatic transfer switch isolates you from the utility grid before your generator energizes anything. That is what protects line workers from backfeed.

Commissioning & Load Test

We run the unit under real load, verify transfer timing, and walk your maintenance staff through the controls. You get the documentation your insurer will ask for.

The Install Process, Step by Step

  1. 1

    Site walk and load analysis

    We measure your actual demand rather than adding up nameplate ratings. Getting this wrong is the single most common failure we are called out to fix.

  2. 2

    Gas or fuel plan

    For gas units we verify the meter and line can carry the additional load. An undersized gas line will starve the engine at exactly the moment you need it.

  3. 3

    Pad and placement

    We set the pad, confirm clearances, and check the unit is above the local flood elevation. In parts of Harris County that last item is not optional.

  4. 4

    Permit and plan review

    The City of Houston has enforced the 2023 National Electrical Code since September 1, 2023. We file the permit and coordinate the inspection.

  5. 5

    Transfer switch and interconnection

    The automatic transfer switch is the safety heart of the system. It isolates you from the utility grid before your generator energizes anything.

  6. 6

    Commissioning and load test

    We run the unit under real load, verify the transfer timing, and walk your maintenance staff through the controls.

Where the Code Actually Matters

Commercial standby is not one category under the National Electrical Code. It is three, and they carry different requirements. Which article your project falls under changes the wiring method, the testing regime and the paperwork. We identify that at the site walk, not after the inspector arrives.

NEC ArticleSystem TypeWhat It Covers
Article 700Emergency systemsLife safety loads such as egress lighting and fire pumps. Transfer must occur within 10 seconds.
Article 701Legally required standbySystems an authority mandates, such as smoke control and elevators.
Article 702Optional standbyMost business continuity work. Servers, walk-in coolers and production lines usually sit here.

The City of Houston has enforced the 2023 National Electrical Code since September 1, 2023. Commercial generator work is reviewed against it.

Facilities We Power in Greater Houston

  • Warehouses and logistics operations where dock doors and WMS servers cannot go dark
  • Medical offices and server rooms with equipment that does not tolerate a dirty restart
  • Office complexes carrying elevators, life safety and tenant obligations
  • Retail centers and fuel stations that stay open when the neighborhood loses power
  • Light manufacturing with three-phase motor loads

We serve Houston, Katy, Cypress, Spring, Sugar Land and The Woodlands. See our full commercial electrical services.

Gillette or Kohler or Generac

We are certified on all three, which means we have no reason to steer you.

Kohler

Our usual recommendation for residential and light commercial standby. See our Kohler generator installation page for that side of the work.

Generac

The broadest residential range and strong parts availability. Covered on our main generators and back-up power page.

Gillette

Earns the job when the site is genuinely industrial. High kW, three-phase, prime power, or a spec calling for a UL 2200 listed domestic build. If your engineer wrote Gillette into the drawings, we can build to it.

Who Runs Your Project

Commercial generator work is led by Jeff Fyke, co-owner and project manager at RBG Services LLC. Jeff is a Master Electrician with electrical experience dating to 2005. He runs the complex residential and commercial jobs and handles the sizing calls that decide whether a system holds under load.

Estimating is led by co-owner Brett Gosnell, who started in the electrical trade in 1994. Between them you get a scope that matches the building, not a template. Read more about RBG Services LLC.

Gillette Generator FAQ

Do you install Gillette generators for commercial facilities?

Yes. We install high-kW Gillette commercial and industrial generators designed for three-phase power and heavy loads. Gillette's industrial range runs from roughly 25 kW to 2 MW.

What size Gillette generator does my building need?

That depends on your measured demand, not your square footage. We perform a load analysis on site and size the unit to your real starting and running load.

Should I choose gas or diesel?

Gas is simpler if your utility gas service is solid, because there is no fuel to store or maintain. Diesel is better for long outages and heavy motor starting. Gulf Coast storm risk pushes many facilities toward diesel.

Do I need a permit for a commercial generator in Houston?

Yes. Commercial generator installations require an electrical permit and inspection. The City of Houston reviews this work under the 2023 NEC, effective September 1, 2023. We handle the filing.

How fast does the system pick up the load?

With an automatic transfer switch, power is typically restored within 10 to 30 seconds. Life safety loads under NEC Article 700 must transfer within 10 seconds.

Are Gillette generators made in the United States?

Yes. Gillette builds at its plants in Elkhart, Indiana, and has manufactured there since the early 1960s.

Do you service the generator after installation?

Yes. We offer backup power maintenance and emergency repairs, and we are available 24/7 for emergency electrical service.

Get a Commercial Quote

Tell us the facility, the load, and the deadline. We will walk the site and give you a real number.

Call (832) 291-4433 Request a Commercial Quote

Financing available • TECL #38858 • Licensed & Insured • 14203 Aston St, Houston, TX 77040

Services

Available 24/7 for Emergencies

Location